11 Water Flushing and Monthly Installation Control Form (For Technical)

Recording Period: Daily-Weekly-Monthly

Responsible: Technical

Month/Year:

Water Flushing Points, By-pass Valves, Boilers 12345678910 11121314151617181920 2122232425262728293031

Monthly Installation Control

Water from boilers is flushed for 3-5 minutes daily, and from other identified points for 3-5 minutes weekly.

By-pass valves are opened weekly and closed after 3-5 minutes.

During monthly inspections, dead point checks within the installation and abnormalities in the water supply system (water tanks, purification, etc.) are checked.

Signature

Form No: LRM-1.11

ISIS_Water_Safety_Forms_2019

Everyone sometimes needs a doctor, but everyone always needs hygiene.