11 Water Flushing and Monthly Installation Control Form (For Technical)
Recording Period: Daily-Weekly-Monthly
Responsible: Technical
Month/Year:
| Water Flushing Points, By-pass Valves, Boilers | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |
|---|
Monthly Installation Control
Water from boilers is flushed for 3-5 minutes daily, and from other identified points for 3-5 minutes weekly.
By-pass valves are opened weekly and closed after 3-5 minutes.
During monthly inspections, dead point checks within the installation and abnormalities in the water supply system (water tanks, purification, etc.) are checked.
Signature
Form No: LRM-1.11
ISIS_Water_Safety_Forms_2019
Everyone sometimes needs a doctor, but everyone always needs hygiene.
